Jan. 2005

The second phase terminal of Shanghai Pudong Airport has a total
area of 500,000 m2, including 400,000 m2 air conditioned area
dividing into main building, linking corridor and long corridor.
Glass curtain walls accounts for 80% of the total wall surface. This
project studies the thermal performance of envelope, energy
efficiency method and the air-conditioning program. SPEC also proved
the green lighting program and the water conservation method by
simulating and assessing the indoor ventilation. This outstanding
energy-conservation project enjoys promising economic value, wide
social, environmental and eco efficiency and the short-term
additional first cost payback period.
|